Drawings - Intro

Page 1 Questions

2. Perkins STC prepares this style of drawing for every project: *This question is required.
3. Choose the type of drawing that was not discussed: *This question is required.
4. A crew is preparing to build equipment that will be used on a project. The drawing showing equipment and settings is: *This question is required.
5. The reason that Perkins STC drawings have multiple views/sheets is: *This question is required.
6. Perkins STC places great emphasis on producing professional drawings. *This question is required.
7. Permit application drawings are: *This question is required.
8. Securement diagrams... *This question is required.
9. Which is NOT true of Traffic Control Diagrams: *This question is required.
10. Metric Permit drawings... *This question is required.
11. Serpentine Bridge Crossings... *This question is required.
12. Intersection turn study diagrams are used when... *This question is required.
13. Customers sometimes do not understand the amount of space required to assemble our trailer and load their cargo. Choose the type of drawing used to discuss assembly space requirements. *This question is required.
14. Plan and Top views mean the same thing. *This question is required.
15. Elevation and Side views mean the same thing. *This question is required.
16. The realistic "Bird's Eye" view of the equipment and payload that is easy to understand and typically does not have any dimensions is called: *This question is required.
17. What term is used to describe equipment leaving for a project loading site? *This question is required.
18. What term is used to describe equipment returning after project unloading? *This question is required.
19. What document shows how unassembled equipment pieces are arranged for transportation to the project site for assembly? *This question is required.
20. Cargo drawings may come in many forms - hand sketches, PDF's, metric, imperial, etc. but are all converted to ____ by the engineering department. *This question is required.
21. Proper "clearance for a turn" considerations would have Perkins STC preparing this type of drawing: *This question is required.
Once you are finished please tap the Submit or Next Arrow button ONCE and wait for your quiz to be scored. Good luck!
0%