Skip survey header

Goldhofer Assembly

Page 1 Questions

2. Perkins STC's objective of this training is to provide knowledge of the following? *This question is required.
3. Select FOUR tools that areused to assemble the Goldhofer Dual Lane Loading (GHDLL) Trailer. *This question is required.
4. What size consoles are needed to make a Goldhofer 18' wide platform trailer? *This question is required.
5. You should start the assembly with the modules blocked up. *This question is required.
6. Position side to side arm with bolt heads _____. *This question is required.
7. When would be the best time to install the tow bar arm? *This question is required.
8. What THREE things should be done with all bolts and pins before installing the consoles? *This question is required.
9. The position of the offset console is the allow the clearance for the side to side steer arm. *This question is required.
10. Insert axle pins ____. *This question is required.
11. When would you tighten all of the console bolts with an impact wrench? *This question is required.
12. Which statement is NOT TRUE when installing the tow bar? *This question is required.
13. How many bolts hold the control panel to the front of the module? *This question is required.
14. The air, electrical, and hydraulic lines _____. *This question is required.
15. The hydraulic cross over lines are connected between the ____ using a 46mm wrench. *This question is required.
16. Pound the side to side steer arm pins with a ______. *This question is required.
Once you are finished please tap the Submit or Next Arrow button ONCE and wait for your quiz to be scored. Good luck!